Merge pull request #1236 from AntelopeIO/merge105112 #3523
build.yaml
on: push
Discover Versions
2s
Platform Cache
/
Discover Platforms
5s
Matrix: Platform Cache / Build Platforms
Matrix: Run Build Workflow / Build spring
Matrix: np-tests
Matrix: Build deb packages
Matrix: tests
Matrix: lr-tests
Matrix: libtester tests
All Required Tests Passed
0s
Annotations
3 errors and 5 warnings
libtester tests (ubuntu22, build-tree)
unable to access 'https://github.com/boostorg/icl.git/': Failed to connect to github.com port 443 after 133295 ms: Connection timed out
|
libtester tests (ubuntu22, build-tree)
clone of 'https://github.com/boostorg/icl.git' into submodule path '/__w/spring/spring/libraries/boost/libs/icl' failed
|
libtester tests (ubuntu22, make-dev-install)
unable to access 'https://github.com/boostorg/boost.git/': Failed to connect to github.com port 443 after 132789 ms: Connection timed out
|
Run Build Workflow / Build spring (reproducible)
Docker pull failed with exit code 1, back off 1.165 seconds before retry.
|
Tests (ubuntu22)
Failed to download action 'https://api.github.com/repos/actions/upload-artifact/tarball/4cec3d8aa04e39d1a68397de0c4cd6fb9dce8ec1'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
Tests (ubuntu22)
Back off 27.011 seconds before retry.
|
libtester tests (ubuntu22, build-tree)
Docker pull failed with exit code 1, back off 6.499 seconds before retry.
|
libtester tests (ubuntu22, make-dev-install)
Docker pull failed with exit code 1, back off 2.547 seconds before retry.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
antelope-spring-deb-amd64
|
51.7 MB |
|
antelope-spring-dev-ubuntu20-amd64
|
42.3 MB |
|
antelope-spring-dev-ubuntu22-amd64
|
42.1 MB |
|
asan-build
|
1.15 GB |
|
asserton-build
|
187 MB |
|
reproducible-build
|
153 MB |
|
ubsan-build
|
943 MB |
|
ubuntu20-build
|
160 MB |
|
ubuntu22-build
|
162 MB |
|