chore(deps): lock file maintenance #869
test-and-sync.yml
on: pull_request
Lint
25s
Matrix: Build & Test
Annotations
5 errors
Build & Test (ubuntu-latest, 20)
Process completed with exit code 1.
|
Build & Test (ubuntu-latest, 22)
The job was canceled because "ubuntu-latest_20" failed.
|
Build & Test (ubuntu-latest, 22)
The operation was canceled.
|
Build & Test (ubuntu-latest, 18)
The job was canceled because "ubuntu-latest_20" failed.
|
Build & Test (ubuntu-latest, 18)
The operation was canceled.
|