Skip to content

chore(deps): bump golang.org/x/oauth2 from 0.27.0 to 0.28.0 (#22211) #39027

chore(deps): bump golang.org/x/oauth2 from 0.27.0 to 0.28.0 (#22211)

chore(deps): bump golang.org/x/oauth2 from 0.27.0 to 0.28.0 (#22211) #39027

Triggered via push March 6, 2025 20:55
Status Cancelled
Total duration 22m 32s
Artifacts 2

ci-build.yaml

on: push
changes
9s
changes
Build & cache Go code
3m 28s
Build & cache Go code
Build, test & lint UI code
1m 42s
Build, test & lint UI code
Ensure Go modules synchronicity
50s
Ensure Go modules synchronicity
Lint Go code
4m 27s
Lint Go code
Check changes to generated code
6m 6s
Check changes to generated code
Matrix: Run end-to-end tests
Run unit tests for Go packages
5m 52s
Run unit tests for Go packages
Run unit tests with -race for Go packages
10m 0s
Run unit tests with -race for Go packages
E2E Tests - Composite result
2s
E2E Tests - Composite result
Process & analyze test artifacts
Process & analyze test artifacts
Fit to window
Zoom out
Zoom in

Annotations

12 errors and 1 warning
Run end-to-end tests (v1.29.8, false)
The operation was canceled.
Run end-to-end tests (v1.29.8, false)
Canceling since a higher priority waiting request for Integration tests-refs/heads/master exists
Run end-to-end tests (v1.32.1, true)
The operation was canceled.
Run end-to-end tests (v1.32.1, true)
Canceling since a higher priority waiting request for Integration tests-refs/heads/master exists
Run end-to-end tests (v1.31.0, false)
The operation was canceled.
Run end-to-end tests (v1.31.0, false)
Canceling since a higher priority waiting request for Integration tests-refs/heads/master exists
Run end-to-end tests (v1.28.13, false)
The operation was canceled.
Run end-to-end tests (v1.28.13, false)
Canceling since a higher priority waiting request for Integration tests-refs/heads/master exists
Run end-to-end tests (v1.30.4, false)
The operation was canceled.
Run end-to-end tests (v1.30.4, false)
Canceling since a higher priority waiting request for Integration tests-refs/heads/master exists
E2E Tests - Composite result
Process completed with exit code 1.
Integration tests
Canceling since a higher priority waiting request for Integration tests-refs/heads/master exists
Build & cache Go code
Cache not found for keys: Linux-go-build-v1-13707979657

Artifacts

Produced during runtime
Name Size
race-results
1.31 MB
test-results
1.3 MB