Skip to content

Merge: Vectorize fuzzy_row_match (#489) #2879

Merge: Vectorize fuzzy_row_match (#489)

Merge: Vectorize fuzzy_row_match (#489) #2879

Triggered via push March 5, 2025 10:23
Status Cancelled
Total duration 11m 19s
Artifacts

ci.yml

on: push
Matrix: lint
Matrix: typecheck
Matrix: audit
Matrix: coretest
Matrix: fulltest
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Lockfiles
Process completed with exit code 128.
Full Tests 3.12
Canceling since a higher priority waiting request for 'Continuous Integration-refs/heads/main' exists
Full Tests 3.12
The operation was canceled.
Full Tests 3.10
Canceling since a higher priority waiting request for 'Continuous Integration-refs/heads/main' exists
Full Tests 3.10
The operation was canceled.
Build Docs
Canceling since a higher priority waiting request for 'Continuous Integration-refs/heads/main' exists
Build Docs
The operation was canceled.